Recently the Buildings Department has been assisting in the setting up of the new temporary signal box/relay room at Medstead Station. This structure becomes operational when the existing original box is de-commissioned for a period of time as plans are discussed for the future of the box. The new ‘box’ was delivered to the station several years ago and has slowly been adapted internally and fitted out with an electric panel for the operation of the station signalling and points through a comprehensive relay room. Our main involvement has been the construction of internal walls and doorways, decoration and the installation of two new sliding windows for the signalling staff to be able to view traffic movements. Also, we have changed the opening orientation of the access gate in the fence for the better exchange of tokens and also, with the assistance of our colleagues in the PWay Department, the laying of a new concrete path to the signal box part of the building. Work has also started on the construction of two wicket gates and restricted access sign boards to facilitate the change to operational procedures for token exchanges for signal and train crew during train movements at Medstead.
The work on the Blakes Crossing keepers hut has continued with the extensive repairs needed, particularly on the country side of the building that gets the weather elements attacking it more fiercely. The new frame pieces have been fixed, a breathable membrane installed and replacement outer cladding timber screwed in place. Sealant, resin filler and aluminium primer has been used to provide better protection to this side, hopefully for many years to come. The window frames have also had repairs both to the woodwork and putty where they had suffered. The hut itself provides a useful base and shelter for station staff when the crossing is in constant use during events for providing level access for visitors to cross the line other than by the footbridge.
Over the last few weeks a team has been working on a new frame, boarding and felt roof for one of the works containers at Alresford headshunt. However, the fairly constant rain on attendance days has meant that progress ground to a halt- you need ‘dry’ to do the job. So, the roof has been temporarily sheeted over until we can see a dryish spell in the offing but a glimpse of a corner of the frame can be seen under the current covering protecting the roof until we return.
Numerous other tasks were undertaken avoiding the worst of the weather including completing the installation of the electric switch boards and posts at Alresford, installation of new roller blinds in the meeting room at Ropley station, repairs to hot water systems, some internal decorating in various buildings, making shelves, making door frames, switchboard cabinets- you name it, all sorts that make the year go so quickly.
We hope you had a Merry Christmas and wish a Happy New Year to all.